|
Projects
Completed & Ongoing Projects:
|
Client Name |
Project Title & Description |
Date |
Status |
|
PCSB |
Provision of Sand Production Prediction Software & Sand Control Manual |
October 2005 |
COMPLETED |
|
PRSS |
OLI System / OLI Analyzer Software One (1) Year Lease |
Dec 05 - Dec 06 |
COMPLETED |
|
National University Singapore - NUS |
OLI System / OLI Analyzer Software Three (3) Years Lease |
Apr 06 - Mac 09 |
COMPLETED |
|
PCSB |
Provision To Lease One Unit of Single Standalone ScaleChem Software License for Two (2) Years |
Jun 06 - Jun 08 |
COMPLETED |
|
PCSB |
Provision To Lease CSP Corrosion Analyzer UI Software and its Associated Maintenance for a period of Two (2) years and One & A Half (1 ½) Days of Training |
Sep 06 - Sep 08 |
COMPLETED |
|
PCSB - Sarawak |
Provision For Environmental Monitoring And Analysis Services For PCSB ¨C Sarawak Operations (PCSB ¨C SKO) |
Dec 06 - Dec 07 |
COMPLETED |
|
PCSB - Sarawak |
Bintulu Crude Oil Terminal |
Sep 07 |
COMPLETED |
|
TL OffShore |
Supply Steel Plate For Hummer Steel |
Nov 07 |
COMPLETED |
|
Shell |
Supply Gen 6.1 Building Structure Steel |
Mac 08 |
COMPLETED |
|
Shell |
Supply Angle Equal & Channel |
May 08 |
COMPLETED |
|
Shell |
Supply Flat Bar & Plate |
Jun 08 |
COMPLETED |
|
Shell |
Supply Plate Type III |
Jun 08 |
COMPLETED |
|
TL Offshore |
Supply H-Beam |
Sep 08 |
COMPLETED |
|
Kencana HL |
Supply of Various Steel Products |
Sep 09 |
ONGOING |
|
|
Consultancy & Advisory Projects:
|
|
• Production/Capacity Enhancement Study - Guntong A, B, C and D. Schlumberger PEG Project for EPMI (Esso Production Malaysia Incorporation) Malaysia. June 2000.
• Production and Reservoir Analysis for Well Completion. Schlumberger PEG Project - Korean National Oil Company (KNOC). February 2001
• IPM Integrated Reservoir Optimization Initiative (YUKOS). Schlumberger IRO Initiative, March-April 2001
• Vyngapuroskoe Production Enhancement Study - Focusing on Finding Well Candidates for Fracturing. Sibneft Project, December 2001 -
September 2002
• Extreme Overbalanced Perforation (EOB) - Alternative to Fracturing to Enhance Well Productivity in Western Siberia. Schlumberger Proposal
to Sibneft, June 2002
• Vyngayakhinskoe - Mature Field Production Enhancement and Reservoir Optimization Analysis. Sibneft Project, December 2001
• Post-Pump (ESP) Optimization Analysis of Sugmutskoe Wells. Sibneft Project, September 2002.
• Performance Comparison of Horizontal Well vs. Vertical Well of Various Sibneft Fields. Sibneft Project, January 2003.
• Romanovksoe Field - Fractured and Horizontal Wells Performance Analysis. Sibneft Project, February 2003.
• Vyngapuroskoe Field Technical Analysis - Production and Reservoir Optimization of Southern BV8 Formation. Sibneft Project, January 2003
• Sidetrack and Horizontal Well Full Scale Simulation Studies of Sutorminskoe BS5 Formation. Sibneft Project, February - April 2003.
• Sporoshevskoe Field Commingled Production Analysis. Sibneft Project, May 2003
• Water Compensation Analysis in Sugmutskoe Oilfield using Classical Material Balance Approach. Sibneft Project, July 2003.
• Sporoshevskoe Field - Horizontal Wells Performance Analysis. Sibneft Project, September 2003.
• Sugmutskoe Field - Horizontal Wells Performance Analysis. Sibneft Project, December 2003 - January 2004.
• Development of Sand Control and Management Field Guidelines Manual, Petronas Carigali, 2008
|
|
Technical Papers
|
|
• Development of Asphaltene Phase Equilibria Predictive Model. SPE Conference, Pittsburgh, PA (1993)
• Design Approach Accounts for Condensates Gas Pipelines. SPE Conference, Pittsburgh, PA (1993)
• PCB Migration in Natural Gas Pipelines. PSIG Proceeding (1993)
• Transient in Wet Gas Pipeline. ASME Wet Gas Symposium (1996)
• Unlocking Production Potential. Schlumberger Middle-East Well Evaluation Review, Number 21. (1998)
• Phase Behavior of PCB-Contaminated Natural Gas. SPE Conference, Calgary, Canada (April 2000)
• Massive Hydraulic Fracturing - A Case History in Western Siberia, Russia. SPE International Conference on Improved Oil Recovery, Kuala
Lumpur, Malaysia (October 2003)
• Keeping Abreast of New Technology Enhances Asset Value - Experience in Romanovskoe Oilfield, Western Siberia. SPE International
Conference on Integrated Modeling and Asset Management, Kuala Lumpur, Malaysia (March 2004) - Joint Paper Publication with Schlumberger
Sibneft (Russia).
• Sporoshevskoe Field - Judicious Application of Horizontal Wells Mitigates Water Coning Problems. For Schlumberger IPM Russia - Internal
White Paper (January 2004)
| | |